Right after the April 2024 halving
- Current block height
- 840000
- Date of that block
- 2024-04-20
- Average block time
- 10
Result Estimated next halving date: 2028-04-17
Halvings so far: 4
Current block subsidy (BTC): 3.125
Next halving block: 1,050,000
Blocks remaining: 210,000
Days remaining: 1,458
Subsidy after halving (BTC): 1.5625
New BTC per day now: 450
- Halvings so far = floor(840000 ÷ 210,000) = 4
- Current subsidy = 50 ÷ 2^4 = 3.125 BTC per block
- Next halving block = 5 × 210,000 = 1050000
- Blocks left = 1050000 − 840000 = 210000
- Days left = 210000 × 10 min ÷ 1,440 = 1458 days
- Estimated date = 2024-04-20 + 1458 days = 2028-04-17
Block 840,000 cut the subsidy to 3.125 BTC. At 10-minute blocks the next cut to 1.5625 BTC lands about 1,458 days later.